PMX Development handles full remodels, kitchen renovations and bathroom renovations for homeowners within 100 miles of Orlando. Every project starts with a free on-site estimate, and every estimate comes with a written scope and a timeline before any work begins.
Get My Free Estimate
A full remodel is the complete renovation of a residential or commercial space — improving how it functions, how it looks, and what it is worth. That can mean opening up a closed floor plan, replacing finishes throughout, or bringing an older property up to current standards.
Most homeowners come to us when patching stops making sense: repeated repairs, a layout that fights daily life, or a property being prepared for sale. If two or three separate fixes are already on your list, a single coordinated remodel usually costs less than doing them one at a time.
We start with an on-site visit, put the scope in writing, then schedule the work in stages so you always know what is happening that week and what comes next.
Kitchen cost is driven by three things: whether the layout moves, the cabinetry you choose, and the countertop material. Keeping plumbing and electrical where they are keeps the number down. Relocating a sink, adding an island with a water line, or opening a wall pushes it up, because those changes bring permitting and additional trades.
Signs it is time: cabinet doors that no longer close square, counters you work around instead of on, or a layout that leaves two people bumping into each other every evening.
We modernize cabinets, countertops, flooring, lighting and layout around how you actually use the room — then hand it back clean and finished.
A bathroom remodel covers showers, tubs, vanities, tile, flooring and fixtures. Scope ranges from replacing a dated tub with a walk-in shower to stripping the room to studs and rebuilding it — including waterproofing, which is the part that determines whether the work lasts.
In Florida's humidity, bathrooms show their age faster than any other room. Grout that keeps failing, soft spots near the base of the shower, or persistent smell after ventilation are signs the problem sits behind the tile, not on it.
We handle the full renovation — demolition, waterproofing, tile, fixtures and finish — and walk the finished room with you before we call it done.
Central Florida conditions shape the materials and methods we specify — and they are why cheap work fails fast here.
Moisture is the main enemy of finish work here. Waterproofing detail and ventilation matter more than they would further north — and they are the first thing skipped on a low bid.
The Orlando area mixes older homes with recent construction. Each brings different constraints, so the estimate follows the property rather than a template.
We take projects across Central Florida within 100 miles of Orlando. Unsure about your address? Call +1 689-334-2486 and we will confirm.
The main cost drivers are cabinetry, countertop material, and whether the layout changes. Keeping plumbing and electrical in place keeps the number lower; moving a sink, adding an island with a water line, or removing a wall raises it because permitting and extra trades come into play. PMX Development gives you a written breakdown after a free on-site visit so you can see exactly where the money goes.
A straightforward kitchen update that keeps the existing layout typically runs several weeks from demolition to final walkthrough. Projects involving layout changes, custom cabinetry, or permitting take longer, mainly because of material lead times and inspection scheduling rather than labor. We give you a stage-by-stage timeline with the estimate and flag which stages depend on outside parties.
A full bathroom remodel covers demolition, waterproofing, tile, flooring, vanity, fixtures, and ventilation. Smaller scopes might be limited to converting a tub to a walk-in shower or replacing the vanity and fixtures. Waterproofing is the part that decides whether the work lasts in Florida humidity, so it is never the place to cut cost.
Permitting depends on the scope. Cosmetic work such as replacing a vanity or retiling generally does not require one, while changes to plumbing, electrical, or structure typically do. Requirements vary by municipality within the Orlando area. We identify what your specific project needs during the estimate so there are no surprises once work is underway.
For most single-room projects, yes. Kitchen remodels mean losing the kitchen for part of the schedule, and single-bathroom homes need a plan for the days the room is out of service. We walk through what will be unavailable and for roughly how long during the estimate, so you can decide before the work starts rather than partway through.
Fill in the form and we will call to confirm a time for the on-site visit. The visit takes about two hours, and you leave with a written estimate and a timeline — no obligation attached.
Prefer to talk? Call +1 689-334-2486 during business hours.
Request Your Free Estimate
No commitment. No pressure. A real visit, a real number.
Our team will reach out to confirm your free estimate and schedule the on-site visit. No calendar needed — we handle the scheduling for you.
Monday to Friday, Monday to Friday, 7:00am to 5:00pm
Hours: Monday to Friday, 7:00am to 5:00pm